Infrastructure Space 02/02/2016
One of our clients is looking to connect with senior global Experts from infrastructure space to understand: 1. What is the preferred operating model (EPC or EPCm) across various sub-sectors in which companies such as Bechtel, Fluor, Bouygues etc. operate? 2. What is the preferred operating model (EPC or EPCm) specifically within power transmission and distribution? 3. How does the preferred operating model differ by country or by project type? Are there country-specific or project-specific criteria that are used in order to arrive at the optimal operating model e.g. geo-political risk, project complexity, availability of sub-contractors etc.?